Cost allocation: Adding a wage component

Add cost allocation to a wage component

mceclip0.png

  1. Add a one-off or fixed wage component.
  2. Select the desired wage component.
  3. Enter the value.
  4. Choose 'book on' to add a cost breakdown.
  5. Select the desired cost center.
  6. If necessary, select the desired cost unit.

Comments

Knowledge base